The Manor Powis NCN76 missing link is very much needed and long awaited, but it has to be a viable link that actually supports active travel. If a flawed and compromised link goes ahead then we will be stuck with it for the next 20yrs.

The problem? Infrastructure is supposed to "Promote consistent and cohesive cycling infrastructure that encourages users to choose more sustainable ways of travelling." (Cycling by Design 2021). The message is repeated through the document that infrastructure has to be direct and safe.

The proposed Manor Powis route consists of bits and pieces of infrastructure. For anyone travelling the 1 mile from Causwayhead to Manor Powis: turn right off A907, go SW then SE on Ladysneuk Road, turn left, NE onto a shared-use farm road with laybys, right turn SE onto narrower shared-use farm road with laybys, continue ESE onto dedicated cycle track, use underpass of A91 shared with farm livestock/vehicles, turn right and S up an inclined ramp, turn 180 degree , head N up ramp, onto the A91 and onto a segregated section for cycles, continue across railway bridge and N adjacent to A91 for 200m to reach Manor Powis. Hindrances and issues include a level-crossing, 6 turns, a blind corner, farm traffic that takes the full width of the farm road, a section that floods, delays at the A91 underpass when livestock are moving, ramps, and most of the route is unlit.

Cycle as a form of transport is a challenging option, Would any commuter who can drive that same section of road, coherently, seamlessly in 2minutes think that using this cycle route is a better option? Active travel infrastructure has to be direct and safe, not a longer, convoluted, jumble of sections with shared-use difficulties. Yes, there are time constraints and money constrains but we have provided thousands of miles of high-quality, seamless infrastructure for motorized transport, with flyovers and underpasses, slip roads, overhead gantries and traffic flows systems. What does it say when, after 20yrs, we can't produce a coherent mile of cycle track to link up our National Cycle Network?

There are much simpler and more direct cycle Manor Powis alignments that could meet Cycling by Design 2021 criteria. Why are they missing from this consultation?

Official updates

Last update: 12 February 2025

Comments

Commenting is not possible because this project is currently not active.

Share

Posted by

Current status

under consideration

Tags

Sustainable development
Mobility
Work, economy and tourism
Energy and technology
Safety
Social inclusion
Health and welfare