Skip to main content

Burghmuir Road

This route will connect St. Ninians Roundabout with Craigs Roundabout and the emerging Viewforth Development. Enabling onwards journeys to the city centre via existing Walk, Cycle, Live Stirling infrastructure on Upper Craigs, train and bus station and, the Forthside Development, Springkerse industrial and retail parks via the proposed infrastructure along Kerse Road.

Key destinations:

  • Forthside Development
  • Springkerse Industrial Estate
  • Springkerse Retail Park
  • City centre
  • Stirling Train Station
  • Stirling Bus Station
  • Onward travel to Stirling University, Bridge of Allan and Dunblane 

This image shows a visual representation of how Burghmuir Road could look based on the current proposed design.

Phases

Phases overview
Phase 1: gathering route feedback
gathering route feedback
Phase 2: analysis of responses and feedback
analysis of responses and feedback
Phase 3: gathering design feedback
gathering design feedback
Phase 4: analysis of responses and feedback
analysis of responses and feedback
Phase 5: Detailed Design period
Detailed Design period

analysis of responses and feedback

13 January 2026 00:00 - 3 February 2026 00:00

Thank you to those who took the time to take part in the 3rd consultation phase and came to our drop-in event at the Crawford Community Centre.

In summary, the majority of respondents were Supportive or Very Supportive of the proposed concept on Burghmuir Road. Respondents Agreed with the alignment through the upcoming Viewforth Development site and many showed their support for segregation between pedestrians and cyclists in the comments. As in the previous consultation phases there were a number of respondents who did not support the proposal or investment in active travel infrastructure whatsoever.

For a more detailed breakdown see the attached report.

From this consultation our mandate is clear. To develop the proposed concept, with improved biodiversity, additional crossings, no further traffic calming on Shirra’s Brae. We will be sharing the finalised design on Engage and our programme with key dates.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    • Event date: January 10th, 2026 from 10:00 to 13:00.

      Location

      Crawford Hall

      Registrants

      4 registrants

    • Event date: November 6th, 2025 from 16:00 to 19:00.

    • Event date: November 1st, 2025 from 10:00 to 13:00.

      Location

      Mayfield Community Centre

      Registrants

      4 registrants

    • Event date: October 16th, 2025 from 13:00 to 16:00.

      Location

      Central Library

    4 events have loaded.