Causewayhead to Bridge of Allan

The project will connect Bridge of Allan with Walk, Cycle, Live Stirling infrastructure at the Hillfoots Road junction, to create a safe walking and cycling route between Wallace High, Airthrey Road, and the junction of Keir Street and Fountain Road.

Thank you to everyone who engaged as part of the design consultation. Please see the Consultation Findings report for download as well a the design drawings via the project stage tabs at the bottom of this page.

The project has now successfully received funding from Transport Scotland via the Active Travel Infrastructure Fund (ATIF) Tier 2 and works will begin on Keir Street in a phased manner from the 5th October 2026 which will last for a period of 12 weeks. The overall works are aimed to be completed by late autumn 2027.


Phases

Phases overview

Tell us what you think

17 March 2025 00:00 - 1 June 2025 23:00

Use the survey to tell us what you think of the proposals for Phase 1 of the project, from Causewayhead to Keir Street.

Events

Past events

  • Event date: May 23rd, 2025 from 15:30 to 19:00.

    Location

    Allan Centre

    Registrants

    2 registrants

  • Event date: May 17th, 2025 from 09:00 to 14:00.

    Location

    Recyke-a-bike

    Registrants

    1 registrant