Skip to main content

Causewayhead Road and Dunster Road

Background

The University Route proposal seeks to promote a reduction in vehicle speeds by narrowing residential roads and provision of street calming measures. Safe controlled crossing points will also be provided where the cycle routes span busy roads.

Currently there is a uni-directional cycle way on either side of the road along Causewayhead road which is separated from vehicle traffic by a white line. The contrast colour is faded and there is the risk of cars parking in the cycleway. The current NCN alignment turns down Dumyat Road and along Dunster Road.

Please download the drawings below to view both proposals in more detail.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
42 participants

Phases

Phases overview

Construction

1 August 2022 23:00 - 4 May 2024 23:00

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    1 event has loaded.