Cowane Street and Goosecroft Road
Background
We have such a great amount of road space along Cowane Street that makes adding in a segregated cycleway less challenging. We are proposing to situate the segregated cycleway adjacent to the footpath on the North side of Cowane Street, and will connect from the train station onwards to Lower Bridge Street.
Other opportunities exist within the carriageway for retrofitting rain gardens. This will help assist with existing surface water issues along Cowane Street. Tree planting in this location will also be possible while maintaining parking spaces. This will also add an additional barrier between the cycleway and the carriageway.
Cowane Street Proposal (1).pdf(2.4 MB)
Phases
Phases overview
Phase 1: Concept Design
Concept Design
Phase 2: Concept Design Feedback
Concept Design Feedback
Phase 3: Developed Design
Developed Design
Phase 4: Developed Design Feedback
Developed Design Feedback
Phase 5: Detailed Designs
Detailed Designs
Phase 6: Construction
Construction
Concept Design Feedback
1 March 2020 00:00 - 1 July 2020 23:00

Upcoming and ongoing events
No upcoming or ongoing events are currently scheduled.
Past events
Event date: March 11th, 2022 from 12:30 to 18:15.
Albert Halls