Skip to main content

Your cookie preferences - Stirling Council

Accepting cookies helps us improve this platform. Read our cookie policy.

Stirling Council Home
  • Home
  • Petitions
  • Events
  • About
  • FAQ

Andrew Abbess

Member since 23 January 2021

All input submitted by this participant

Trending ideas have loaded.

Do not paint narrow advisory cycle lanes: poor practive

Andrew Abbess•2 years ago The proposed narrow painted advisory cycle lanes on Ladysneuk Road will encourage close passing of riders by people in motor vehicles. Paint is not protection and where it encourages drivers to "stay in their lane" close to the rider it actually encourages close passes. The diagram of a car driving between 2 riders on your plans is an example of a driver close passing 2 riders. Go back to highway code rule 163: It advises drivers to be at least 1.5m from riders. National standards for Cycle Training advises riders to be at least 1m from kerb. These narrow painted cycle lanes to not promote best practive riding or driving. There was a problem of riders being close passed while in a narrow painted advisry cycle lane on Causewayhead Road (see photo) before the substandard narrow painted cycle lanes were replaced with kerb seperated quality infrastructure. It is still a problem with the narrow painted cycle lane outside Graham dairy on Airthrey Road. Do not introduce these antiquated old fashoned painted lanes on Ladysneuk Road - PAINT IS NOT PROTECTION and when it facilitates close passes it makes things worse.

Failure to connect with St Modans High school

Andrew Abbess•2 years ago These plans show no safe connection from the new infrastructure on Forthside way to St Modans High school which is 300m away. This is a major fail and reduces the potential number of path users. Although many children are bussed to St Modans others living in Stirling would be able to cycle if there were a safe route and would have more option for after school events. In addition St Modans has a fleet of bikes but are severly restricted to where they feel it is safe to take children on them. students doing advance highers sometime take some subjects at other Stirling High schools or FVC, safe cycle infrastructure between these locations would enabe students to independently travel between institutions while developing independance and gaining health benefits of active travel

No upgrades to NCN 76 on Munro Road. This is ignoring the weakest link

Andrew Abbess•2 years ago There are upgrades shown either end of Munro Road for people cycling by nothing to protect people actually riding on the road on NCN 76 on Munro Road. This and the railway bridge on Forth Place are the places it is so dangerious that people (other than the fit fast and brave) will not ride. You are taking action to make the path from Gabes to Peak from very good to world class but ignoring the currently very poor sections that stop people from taking up riding a bike. Do reconsider your priorities and fix the really bad sections rather than tarting up the okay sections

Plans show speed limit 30 mph. It must remain 20 mph

Andrew Abbess•2 years ago Plan SMN -WHL-AT-EP-DR-C-9150 shows the speed limit on Forthside Way as 30 mph. It is currently 20 mph. The speed limit must not be increased to 30 mph as sharing the road with busses at 30 mph will put off the less confident riders who you hope will take up using bikes to get about.

Missing link over railway bridge to new cyclepaths.

Andrew Abbess•2 years ago My biggest concern is that these plans do not show the NCN76 proposals actually connecting with NCN 765 and the new WWCL infrastructure at the traffic lights at Seaforth Place. This is a major gap in the network especially if we want children riding unaccompanied to Peak or St Modans High.It makes sence to tie in the proposed upgraded NCN 76 routes to the new WWCL stirling infrastructure & NCN 765, especially where the new works also are NCN routes & lead to significant destinations such as The Peak or St Modans High school. The reduction in traffic on the Forthside Way will need to happen very early in the project otherwise it will not make an attractive cycle route for those who are not fit, fast & confident - all your target groups for new infrasturcture. Mapping systems wil need updating early so drivers sat navs dont continue to send them along a route for busses & bikes However do check with the Active Stirling disability cycling group which option is best for them and go with that. They are currently very restrained as to how far they can get their adapted bikes from the Peak.

Inconsistant cycle path colour

Andrew Abbess•2 years ago On the plans the cycle routes are sometimes red and sometimes blue.On the new WWCL infrastructure in Stirling, from town to University and FVC, the paths are sometimes buff and some times green.There must be more consistancy. You have started with one colour palet on WWCL - now stick with it for all the others

Route ends. No link to other routes

Andrew Abbess•1 year ago The walk wheel cycle Live Stirling route ends at the bottom of Upper Craigs with no signage showing the route via a Stirling Council Core Path to the Criags underpass and the other routes that meet there. Its time to start building a netowork rather than a disconnected series of routes.

No Shared use sign at the end of the bridge so riders get abuse from pedestrains who think they are breaking the law by

Andrew Abbess•1 year ago Need a shared use sign at both ends of the bridge pavement

Shared use path crosses junction which is too wide and needs tightening up

Andrew Abbess•1 year ago There is a shared use waling and cycling path along the pavement from Bannockburn Primary to the toucan crossing by the Telford Bridge. However the junction of New Road and Main Street is too wide for children travelling to the primary school to manage. It is much too wide and there is nothing to remind drivers turning into or out of Main Street that the highway code give priority to pedesstrains and cyclist crossing main street at the junction. This junction need to be redesigned to reinforce the priority those walking wheeling & cycing have.

Beware drivers parking on new cycle & walking path if rocks removed

Andrew Abbess•2 years ago The new plans show the area of rocks between the motor vehicles and the cycling & walking path being removed. Beware: until Stirling council made the rocks bigger many of the Peak users used to park on the gravel area & cycle path. They only stopped doing this when bigger rocks were put in place that might damage their vehicles - now they use the car park. With the rocks removed there will be nothing to stop bad drivers parking and blocking the cyclepath & footway again. Bollards, rocks or some other physical barrier is the only effective way to stop this

Good that toucan crossing of Kerse Road is being saved

Andrew Abbess•2 years ago Excellent to see the toucan crossing for NCN 76 at Kerse Road is being saved. I understood the developers of the ASDA & new car showroom on the adjacent Crookbridge retail site wanted to obliterate this active travel crossing. well done standing up to the developers (planning refs: 23/00465 & 21/00260)

will the new path for pedestrains and cyclist require people to cross the A9?

Andrew Abbess•2 years ago If your design for a new path requires riders & pedestrains to cross the A9 then with the current speed and volume of motor vehicles a grade seperated or light controlled crossing will have to be built to make it safe to cross. Or significantly reduce the speed and volume of traffic on A9 between Kier Roundabout and BoA.

Failure to connect cycle route to new drive through

Andrew Abbess•2 years ago The plans show no connection from the new cycle path to the active travel path access from the bus stop on Forthside Way through to the new drive through location on Borrowmeadow Road (planning refs: 22/00854 & 24/00650) This could be achieved by making the zebra at the bus stop a parallel Walkning & cycling crossing and making the new path into the new drive through a shared use path rather than a footway. Also upgrade the informal path connection to the industral units offices & Heatfitness gym on Borrowmeadow Road

whitehouse road share use path must tie in to new infrastructure

Andrew Abbess•2 years ago Plan SMN -WHL-AT-EP-DR-C-9154 P01 Shows the pavement beside Whitehouse Road as a footway. Currently this is a shared use walking & cycling path permitting riders to leave the industrial estate contra flow to the one way street and join the cycle path between Peak & Gabes diner. This must remain shared use and not be changed to a footway. Furthermore there must be a good connection to the new cycle path. This would be enabled by extending the shared use path to the new zebra crossing of Forthside way and converting the Zebra to a parallel crossing. At the south end of Whitehouse Road there is a dropped kerb missing to enable rides to join the shared use path. The dropped kerb must be added as part of these works

Barriers breach of Equality Act need to be removed at ferry Court Cornton

Andrew Abbess•10 months ago Barriers in breach of Equality ACt that are too narrow for a disabled rider using an adapted cycle must be removed

Barriers breach of Equality Act need to be removed at Cornton road junction with walking and cycle path beside railway

Andrew Abbess•10 months ago Barriers too narrow for disabled riders using non standard bikes as mobility aids. remove them. They also stop the council small gritters getting access as could be seen in recent ice & snow.

No paint or signage for visiting riders advising them of a protected cycle path .

Andrew Abbess•10 months ago For riders not famillar with the area who are heading north on Millenium way there is no paint or signage to advise them that they can join a wand protecteed cycle path. The entrance area is short and a rider who is pressing on so as not to delay traffic may find they are passed the entrance and on to the wand section with the gaps being too narrow to join, especially if they are keeping up a pace so as not to annoy drivers. They may be wary of slowing to a speed where they could slalolm into the path as tailgaiting drivers may then collide. Provide advance notice of protected cycle infrastructure about to begin so people can move onto it

Coonection between wand proteted cycle path and old railway path poor

Andrew Abbess•10 months ago There is a blooard restricting access to those using non standard cycles and a muddy surface and raised manhold cover to avoid.

Replace parallel crossing downgraded to zebra near junction Cowain St & Goosecroft

Andrew Abbess•10 months ago There used to be a parallel crossing here, which has been down graded to z zebra. return it to a parallel crossing to connect the cycle infrastructure on both sides of the road. There should be links between cycle infrastructure to create networks

need a zebra crossing to facilitate safe crossing of St Ninians Road for pedestrians coming from new 7 sisters scheme

Andrew Abbess•10 months ago The planning consent for this new development included a requirement for a safe crossing here for familes crossing the main road. The dropped curb and dotty pavings are not enough. Closer to Cambusbarron library & the Foresters arms two zebra are required for safe crossing of the same road. Families & elderly deserve the same protection getting out of this new housing scheme

Need safe cycle provision from Killin to Crainlarach

Andrew Abbess•10 months ago There is no safe cycle provision from Killin to Crainlarach. Two riders have been killed on the A85 in the last few years. Fix this

Make Deanstone Road a walking cycling & horse riding friendy road with reduced speed limit

Andrew Abbess•10 months ago Until the safe cycle route from Doune to Callander is built along the old railway route the only safe way to cycle from Doune to Callander is along the Deanstone Road. Reduce the speed limt & put up signs warning drivers that they are sharing space with those walking cycling & riding horses

Need signage to show pavement outside Baptist church is a shared use path

Andrew Abbess•10 months ago There are some subtle paving slabs that indicate the pavement outside the Baptist church is a shared use path but they are far from obvious. Need clear signage and some sort of share with care message. Otherwise we get conflict between peol eriding carefully and legally and those pedestrains who are angry that people are cycling on the pavement. Or remove space from motor vehicles to put in space for pedestrains and space for riders. Even better make thie area like the space outside Marks & Spencer. Pedestrain priority, cycling & horse riding legal and only motor vehicles making deliveries. we are not permitted to take out cars into the Thistles shopping centre and that seems to work okay for everybody....

Paint on bridge at Manse Road Aberfoyle not compliant with Highway Code rule # 163

Andrew Abbess•10 months ago The painted pedestrain space encourages drivers to close pass pedestrians. If pedestrian is on the bridge then there is not space for a safe overtake and drivers need to wait .Fix: burn off paint & warn drivers not to enter bridge if pedestrians are present. Alternativly it would be complaint with the Highway Code rule 163 to paint the whole bridge surface red, paint pedestrian & wheel chair icons in the middle and put up signs make it clear to drivers that they do not enter the bridge if pedestrians are present. This would also be compliant with Highway Code Rule H1 which promotes the concept that those in charge of vehicles that can cause harm have the greatest responsibility to take care and reduce the danger they pose to others
  • Terms and conditions
  • Privacy policy
  • Cookie policy
  • Accessibility statement
  • Site Map
Powered byGo Vocal formerly CitizenLab